Rio 2016 Apps

Enhance your Games experience.

Download
Who are you cheering on?

Who are you cheering on?

Choose your favorite athletes, teams, sports and countries by clicking on the buttons next to their names

Note: Your favourites settings are stored on your computer through Cookies If you want to keep them, refrain from clearing your browser history

Please set your preferences

Please check your preferences. You can change them at any time

Expand Content

This time zone applies to all schedule times

Expand Content
Contrast
Original colours Original colours High contrast High contrast
View all acessibility resources
A new world

New images and video reveal construction progress at Barra and Deodoro Olympic Parks

By Rio 2016

Brazilian government provides update on 18 venues that will be used for the Rio 2016 Olympic and Paralympic Games

New images and video reveal construction progress at Barra and Deodoro Olympic Parks

The Olympic Tennis Centre, in the foreground, and the Olympic Aquatics Stadium, in the background (Miriam Jeske/Heusi Action/Brasil2016)

The Brazilian Ministry of Sport has released new images and a video showing the progress being made at Barra Olympic Park and Deodoro Olympic Park, the two largest venue clusters for the Rio 2016 Olympic and Paralympic Games.

Captured in August, the images show the Olympic Parks taking shape as preparations enter the final straight with just under one year until the opening ceremony. The Brazilian federal government website for the Games also provided information on construction progress, based on information provided by the Rio city government, which is responsible for the construction.

BARRA OLYMPIC PARK

Carioca Arena  1

Sports: basketball, wheelchair basketball, wheelchair rugby

Current situation – The roof has been finished and work is being finalised on the permanent stands. Work on internal walls, elevators and changing rooms is ongoing. 

Carioca Arena 2

Sports: judo (Olympic), Greco-Roman and freestyle wrestling, boccia

Current situation – The roof has been finished, as has the installation of the natural lighting system, drainage, elevators and construction of the façade. The temporary seating has also been installed and work continues on the flooring and internal walls.

Carioca Arena 3

Sports: fencing, taekwondo, judo (Paralympic)

Current situation – The roof has been finished, as has the work on the natural lighting system and elevators. Guard rails, internal walls and temporary seating are being installed.

Olympic Tennis Centre

Sports: tennis, wheelchair tennis and football 5-a-side  

Current situation – Construction of the main concrete bowl has been completed and work on the metallic roof is in the final stages. The second layer of asphalt on the main court has been laid, leaving only the painting of the court. 

Rio Olympic Velodrome

Sports: track cycling (Olympic and Paralympic)

Current situation – The metallic structure and concrete levels are being mounted and access ramps are being finalised. Work on the plumbing system is progressing well.

Future Arena

Sports: handball, goalball

Current situation – The main structure is completed. Owing to the venue’s temporary nature, the seats will be rented and installed closer to the test event next year. The venue has already staged a goalball match, and after the Games the arena will be dismantled and its parts used to construct four public schools.

Sports: diving, synchronised swimming

Current situation – Work is ongoing on the warm-up pool, as is the renovation of the changing rooms and medical centre. The hot water piping in one of the competition pools has been replaced and is being tested.

Rio Olympic Arena (existing venue)

Sports: gymnastics (artistic, rhythmic, trampoline), wheelchair basketball

Current situation – The venue is ready and only requires some adaptations, which will start later this year.

Parque Olímpico da Barra

Barra Olympic Park, the heart of the Rio 2016 Games (Photo: Miriam Jeske/Heusi Action/Brasil2016)

 

DEODORO OLYMPIC PARK

Olympic Shooting Centre (existing venue)

Sports: shooting (Olympic and Paralympic)

Current situation – Among the areas being renovated are the facade, bathrooms, public walkway, electric installations and stands. Construction of the new shotgun ranges has been completed.

Deodoro Aquatics Centre (existing venue)

Sports: modern pentathlon (swimming)

Current situation – Impermeability testing has been completed as have the concrete slabs for the support buildings. Work on re-tiling the pool is ongoing.

Olympic Equestrian Centre (existing venue)

Sports: equestrian (Olympic and Paralympic)

Current situation – The cross country course was used for the test event and extra sections are being finalised. The renovation of the covered ring and one of the training areas has been finished, while work on three more training courses is being finalised.

Olympic Hockey Centre

Sports: hockey

Current situation – The foundations and metal frames of the permanent stands have been completed, while work on the changing rooms is ongoing. Preparation of the bases of pitches one and two and the training field have been completed.

Parque Olímpico de Deodoro

The X-Park in Deodoro will host the BMX, mountain bike and canoe slalom venues (Photo: André Motta/Heusi Action/Brasil2016)

 

Youth Arena

Sports: modern pentathlon (fencing), women's basketball (first phase), wheelchair fencing

Current situation – Work on the metal structure, roof and pre-moulded stands has been completed. Work is ongoing on the pavements, ramps, floors, changing rooms and technical areas.

Whitewater Stadium

Sports: canoe slalom

Current situation – the concrete structures of the lake, competition and training canals, pumping station and technical building have been completed. Reinforcing and water-proofing of the competition and training canals is being completed, while the pumps are being installed. The pathway linking the venue with the BMX course is in the final phase of completion.

Mountain Bike Centre

Sports: mountain bike

Current situation – Work on the course and grass planting in the common areas are in their final phases. Check out this video of the course designer riding the course.

Deodoro Stadium

Sports: rugby, modern pentathlon (equestrian and combined running/shooting section), football 7-a-side

Current situation – Earthworks are underway on this temporary venue.

BMX

Sports: BMX cycling

Current situation – The first new venue to be ready in 2015, the BMX course was unveiled last month.